Monticello Area Interchange Project

Expanding Access. Strengthening Regional Connections.

The Monticello Area Interchange Project is a long-term effort to improve access to I-94 and strengthen connections across the Mississippi River in the growing Monticello region. A potential new interchange west of the existing Highway 25 interchange could become part of a larger transportation solution linking I-94 with Highway 10 in Sherburne County.

As communities and businesses expand on both sides of the river, this project represents an opportunity to build a more connected, reliable transportation network that supports residents, employers and freight movement for decades to come.

Minnesota locator map showing the Monticello project area northwest of the Minneapolis–St. Paul metro area.
Monticello area, northwest of the Twin Cities.
Aerial view of the existing Highway 25 bridge over the Mississippi River and downtown Monticello.
The existing Highway 25 crossing connects Monticello and Big Lake across the Mississippi River.

The Challenge

Today, Highway 25 provides a critical Mississippi River connection between Monticello and Big Lake. Growing traffic demand places pressure on the existing crossing and surrounding road network, affecting travel times, reliability and access for communities on both sides of the river.

Limited river-crossing options also make it harder for the region to accommodate future growth. Addressing these challenges requires looking beyond any single interchange to the broader connections among I-94, Highway 25, Highway 10 and local roads.

Regional study-area diagram showing I-94 and Highway 10 connections and Mississippi River crossings from St. Cloud to Elk River.
Highway 25 river crossing study area and regional connections.
Map identifying typical congestion and crash concern locations along Highway 25 between I-94, Monticello, Big Lake, and Highway 10.
Congestion and crash concern locations identified in the regional study.

Our Goal

The I-94 West Corridor Coalition supports advancing a well-planned, fundable Monticello-area interchange that improves interstate access and complements regional work toward an additional Mississippi River crossing. We are advocating for transportation solutions that will:

Where the Project Stands

Planning remains underway for the larger Highway 25 area transportation effort. Wright and Sherburne counties and the Central Mississippi River Partnership (CMRP) have examined alternatives for improving travel between I-94 and Highway 10, including options for an additional river crossing and a new interstate interchange.

The Planning and Environmental Linkages (PEL) study evaluated several potential solutions. Among the alternatives identified for further consideration is a western Monticello option involving a new I-94 interchange, a Mississippi River bridge and connecting roads. Other alternatives remain under consideration, and no final crossing location, interchange design or corridor alignment has been selected.

CMRP is supporting the next environmental planning steps and advocating for the resources needed to move this major regional effort forward. The Coalition will continue to support coordination with local and state transportation partners as the interchange concept develops.

Study map showing three PEL corridor alternatives and industrial growth areas near Monticello, Becker, and Big Lake; no final route has been selected.
PEL alternatives and industrial growth areas shown for planning context. No final crossing location, interchange design or corridor alignment has been selected. Select the map for the official alternatives update.

Project Status

Regional Planning

PEL study completed

Interchange Location / Alignment

Alternatives under evaluation

Environmental Review

Pre-scoping and coordination; Tier 1 EIS anticipated next

Engineering / Final Design

Future phases

Construction Funding

Not yet secured

Construction

Schedule to be determined

Study Schedule and Next Steps

The project is advancing through a multi-year planning and environmental process. Current milestones outlined by CMRP include:

  1. 2022–2025: Initial planning and PEL study
  2. 2026: Environmental coordination, pre-scoping and updates to the project purpose and need
  3. 2027–2029 (anticipated): Tier 1 Environmental Impact Statement to evaluate corridors and support selection of a preferred corridor
  4. 2029 (anticipated): Implementation planning and funding strategy
  5. 2030 and beyond (anticipated): More detailed Tier 2 environmental review, followed by final design, permitting and construction when approvals and funding allow

These milestones are planning estimates, not a committed construction schedule. The exact interchange and river-crossing configuration will depend on the study findings, environmental review, agency decisions and available funding.

Why It Matters

Better Regional Mobility

More options for traveling between I-94, the Mississippi River and Highway 10 can help the region address current congestion and prepare for future travel demand.

Safer, More Reliable Connections

Improved access and a more resilient regional road network can provide more predictable travel for residents, emergency services and commercial vehicles.

Supporting Economic Growth

Enhanced interstate and cross-river connectivity can improve access to jobs, support local employers and strengthen opportunities for responsible development.

Planning for the Long Term

Coordinated investments can position Monticello and surrounding communities for sustained growth while accounting for environmental and community needs.

Learn More

The Central Mississippi River Partnership is coordinating regional advocacy and sharing updates on the broader Highway 25 and Mississippi River crossing effort. Learn more at mississippiriverpartnership.org.